When: 29th May
Duration: 3 days
Why: To carry out planned civil works – this includes vegetation clearance and kerbing works prior to Fine milling works.
Joanne Sexton is pleased to confirm that she has been able to deliver this much needed resurfacing. Surrey Highways will be carrying out specialist concrete work where they will clean and reseal/repair any of the joints and cracks in the road before it is resurfaced with a thin layer of Milepave.
Information for these works can also be found on one.network here: https://one.network/?GB138512814

